
Jere, Kaduna State – In a landmark move for Nigeria’s infrastructure development, President Bola Tinubu has officially commenced the comprehensive reconstruction of the strategic Abuja-Kaduna-Zaria-Kano highway, a critical economic artery serving northern Nigeria.
Project Specifications:
- Route Span: 265km dual carriageway connecting four major cities
- Scope: Complete rehabilitation including:
- Road surface replacement
- Bridge repairs/upgrades
- Modern safety features installation
- Drainage system overhaul
- Implementation: Phased approach with Abuja-Kaduna segment as priority
Economic Significance:
- Transport Hub: Links Nigeria’s capital to 12 northern states
- Commercial Lifeline: Carries 65% of northbound goods from Lagos ports
- Agricultural Corridor: Vital for moving farm produce to markets
- Safety Imperative: Accounts for 22% of fatal crashes on federal roads (FRSC 2024 data)
Official Statements:
Governor Uba Sani, representing President Tinubu, emphasized:
“This project fulfills our Renewed Hope infrastructure mandate. The highway’s deterioration – with some sections achieving just 30% of designed capacity – has constrained northern Nigeria’s economic potential for nearly two decades.”
Construction Timeline:
- Phase 1 (0-6 months): Emergency repairs on worst sections
- Phase 2 (6-18 months): Full reconstruction Abuja-Kaduna
- Phase 3 (18-36 months): Kaduna-Kano modernization
- Completion Target: Q4 2027
Stakeholder Reactions:
- Transport Unions: Welcome promised laybys and truck parks
- Business Groups: Anticipate 40% reduction in logistics costs
- Residents: Hope for improved road safety and property values
Technical Features:
✔ Intelligent transport systems
✔ Solar-powered lighting at critical sections
✔ Dedicated motorcycle lanes
✔ Modern weigh stations
Funding & Oversight:
- Budget: ₦850 billion (PPP arrangement)
- Oversight: Federal Ministry of Works + Presidential Monitoring Team
- Quality Assurance: International engineering consultants engaged
Alternate Routes:
Motorists advised to use:
- Abuja-Lokoja-Okene-Kaduna
- Abuja-Keffi-Akwanga-Jos-Kaduna
🚧 Stay Updated:
👉 Bookmark for construction progress reports
👉 Comment: Which section needs urgent attention?
👉 Share to spread development news!
Pro Tip: Alternate routes available during construction – check @FMWH_Nigeria for advisories.